ISDE 2026 for heat pump and air conditioning installers: what is changing, and what that means for your applications
ISDE conditions can matter when customers compare sustainable-energy projects. This article presents six selected 2026 changes, a first-air-to-water heat-pump calculation and the refrigerant exclusion, with source checks dated 29 September 2026. It is not an exhaustive eligibility guide or evidence that subsidy queries are every installer’s largest traffic source. Start with the applicant route and project dates: owner-occupier and business application sequences differ. No funding, legal-compliance or enquiry outcome is guaranteed.
- Unzip it into
~/.claude/skills/(or.claude/skills/in your project). - The description explains the intended topic. Automatic discovery and correct model behaviour are not guaranteed; inspect the actual output.
- Start Claude Code with claude, then enter
/isde-appliance-checkinside the session.
- Go to Customize and then Skills.
- Upload the zip there as a skill.
- Or paste the contents of SKILL.md into the project instructions of a Project.
- Open
AGENTS.mdin your repo. - Paste the contents of SKILL.md into it, or put SKILL.md alongside it as a separate file and reference it from
AGENTS.md. - Codex reads that along with every session.
What has actually changed in 2026
reg. IN.001This sheet selects six changes from RVO’s 2026 information, checked on 29 September 2026. It is not a complete list of changes or conditions: RVO also addresses biobased-material scoring and ground insulation. Confirm the owner-occupier or business route, relevant dates, property, appliance and documentation before drawing a project conclusion.
Subsidy questions can be a useful content topic; measure actual demand
Customers may ask about subsidy amounts, eligibility and budget availability. Establish how important those questions are for your business using actual queries and enquiry data; this page supplies no market-wide search-volume or click-price comparison. A current explanation can answer a genuine question, but does not guarantee year-round traffic or lower advertising costs.
An installer does not have to offer an application service to explain the published conditions. State the boundary of your service and direct unresolved eligibility questions to RVO. For the owner-occupier heat-pump route, RVO requires the full installation to be performed by a construction installation company, not by the applicant. Check the applicable route rather than turning this into a universal instruction for every project.
There is also a sales argument in this that often gets skipped over
Establish the applicant route before the customer commits. Owner-occupiers normally apply after installation and payment; a heat-pump application must be within 24 months after installation. Business users must apply before accepting a quotation, reserving an appliance or commissioning installation, and RVO advises waiting for the decision. Record the reporting code (meldcode) if available. An unlisted unit can still be submitted with product and technical documentation, but RVO may reject it. A listed product is not a funding award.
An outdated page can mislead a customer; review it when conditions change
Add the actual source-check date and official reference, and schedule a review around annual changes and relevant announcements. A January reminder is a useful editorial convention, not proof that one annual check is sufficient. No ten-minute maintenance cost or guaranteed return has been measured here. Recheck current conditions before using an amount in a real quotation.
Starting amount plus capacity, this is how it adds up
reg. IN.002For a first air-to-water heat pump under the standard 2026 calculation, the base is €1,025 plus €225 from the first kilowatt, with a possible €200 A+++ bonus. These four illustrative capacities show the base components only. They are not a sizing recommendation, do not cover every applicant or transition case, and do not establish entitlement. Check the exact appliance and applicable dates; a documented 2024 purchase installed in 2025 or 2026 can fall under RVO’s transition.
The refrigerant test is a subsidy exclusion, not a complete eligibility test
RVO’s 2026 information excludes split air-to-water heat pumps with both a refrigerant charge below 3 kilograms and a GWP above 750. Keep both conditions and strict thresholds visible. Confirm the rule’s application to the project dates and applicant route. This describes ISDE eligibility; it is not a blanket declaration that every such installation is legally prohibited or that all other units qualify.
Explain the appliance facts and what remains uncertain
Two apparently similar appliances can have different relevant specifications. Record refrigerant, charge, GWP and configuration, and identify the particular subsidy rule being checked. Separate an established exclusion, potential eligibility subject to other conditions, and not yet determined. Do not promise an award or claim that an unchecked competitor offers no such information.
In practice that means three things
One: record the refrigerant, charge, GWP and monobloc or split configuration from reliable appliance documentation. Two: present key facts as accessible page text alongside source documents; do not claim that AI systems can never read PDFs or images. Three: include applicable facts and uncertainties in the quotation. Their presence helps comparison but does not prove that an assistant will retrieve or cite them.
It also belongs in your advert copy, because there is room there for exactly this kind of distinction
State only substantiated appliance and documentation services. Do not claim that every installation or customer qualifies, or that a reporting-code entry guarantees an award. How to build that kind of copy without going over the character limit is covered in advert copy for tradespeople NL.
Two appliances, two outcomes
reg. IN.003The diagram isolates one 2026 exclusion: split air-to-water, charge below 3 kilograms, and GWP above 750. It does not assess every condition, applicant route or date. The two branches are not a comparison of efficiency, total project cost or guaranteed awards, and this page has not measured how long installers take to perform the check.
Three possible visitor needs to test against campaign evidence
A useful working distinction is subsidy information, system comparison and breakdown help. Someone using a subsidy query may be researching or may already be ready for a quotation; the keyword alone does not prove readiness. Answer the question and offer a suitable optional next step, then measure relevant enquiries instead of assuming that a quotation link necessarily wastes money.
The second group is the system chooser
A system chooser may compare all-electric, hybrid, air-to-water, ground-source or insulation-first options. Price can still matter, and neither order value nor decision length is established by the category. A qualified assessment should consider heat demand, insulation, emitters, connection requirements and verified local constraints. Do not infer that grid congestion automatically rules out a system at a particular address.
The third group is the breakdown searcher
A breakdown can create urgency, but this does not prove that customers never compare, call the first company or produce the lowest acquisition cost. Advertise only genuine service and availability, state applicable call-out charges accurately, and handle calls within promised hours. Evaluate answered calls, qualified work and actual margin; do not increase spend from an assumed conversion rate.
Consider differentiated pages and bids only where evidence and volume justify them
Choose bids using verified lead quality, conversion definitions, capacity, costs and actual margin. Search intent alone does not justify a high or low maximum, and this article authorises no campaign change or spending. How to let those bids move automatically without losing control is covered in bid strategy for tradespeople NL.
Certification as advert copy, not as a footnote
IPLO describes certification or, in specified cases, attestation for people performing particular work on equipment with fluorinated gases or natural refrigerants. Company certification is required in specified cases, not automatically for every activity an installation business performs. Check the current task, refrigerant, certificate scope and transition rules with the relevant certifying body. State only credentials you actually hold.
Place relevant, verifiable credentials where customers can understand their scope
Give the credential, holder, applicable work and a way to verify it. A certificate does not by itself guarantee quality, lawful completion of every aspect of the project, warranty validity, insurer acceptance or subsidy approval. Check each of those matters separately. Do not turn a general legal requirement into a unique superiority claim.
The same applies to your membership of a trade association, to any recognition scheme, and to the guarantee periods you offer
These details may help comparison; this page has not observed every visitor’s decision process. Our broader explanation of how to build that trust signal is in the guide to local SEO for installation companies NL, including how to make it visible on your Google Business Profile too.
One last, practical note
Put your certifications on the site as plain text too, not only in an image or a PDF of the certificate. Accessible text can help people and systems understand the credential; some systems can process images or PDFs, and no retrieval or citation is guaranteed. How that works and what to do about it is described in getting found in AI Overviews and ChatGPT NL.
Grid congestion: an objection that can become a sales argument
Network capacity can be relevant to a system design, but this page has not checked capacity for any address or service area. Verify the responsible grid operator’s current information and the project’s connection requirements. A general congestion map does not by itself determine whether a household heat pump can be connected or which design is appropriate. Treat this as a technical constraint to investigate, not a sales opportunity established for every customer.
Discuss verified constraints without claiming that most competitors ignore them
Explain what is known for the actual project and distinguish it from unverified local assumptions. Choosing hybrid or all-electric requires a competent assessment of heat loss, emitters, insulation, electrical connection and operating conditions. A moderately insulated home or a general waiting-list report does not by itself establish that hybrid is the wiser option. Do not promise trust, savings or suitability from this paragraph.
Publish local information only after verifying the operator, relevant scope and date; explain what needs project-specific confirmation
Useful verified local information can distinguish pages; it is not something a national site can never supply. Avoid location pages that merely change a heading or invent network facts. We build those pages for this trade at heat pump installers in Arnhem NL, heat pump installers in Nijmegen NL and heat pump installers in Apeldoorn NL, each with its own local story.
What you should not do is sell through fear
No heading saying the grid is full and you need to act now. Grid congestion is a technical fact with a local effect, not a deadline. The honest story is strong enough without building urgency around it that is not there.
A suggested subsidy-page structure in six blocks
Block one: explain the scheme and relevant applicant route. Block two: show a conditional amount calculation, such as FIG.02, with bonus and transition limitations. Block three: state the actual application sequence and evidence requirements. Owner-occupiers generally apply after installation and payment; business users must apply before accepting a quotation or reserving/commissioning the appliance. For homeowner heat pumps, check the 24-month deadline, professional installation, property conditions and reporting-code or technical-documentation route.
Block four: explain the six selected changes from FIG.01 and link to the complete current RVO conditions
Treat those six points as a selection, not the whole scheme. Block five: explain the refrigerant exclusion, other unresolved conditions and where to check current budget information. Block six: identify what you offer and what the customer must do, including any separately authorised intermediary service. Keep uncertainty visible; do not imply that a page or quote reserves subsidy.
Add visible answers to real customer questions; any structured data must match the page
Visible answers can help readers. Google stopped showing FAQ rich results from 7 May 2026; keeping accurate FAQPage markup does not guarantee search or AI visibility. Our explanation of that is in technical SEO.
And measure it
Set up a filter in Search Console for relevant query terms such as ISDE and subsidie, and review a meaningful period with volumes, clicks and qualified-enquiry denominators. Eight weeks is only a review convention. No enquiries does not prove the CTA is wrong, and no traffic does not prove the page is generic; investigate indexing, demand, relevance and measurement first. Want a second pair of eyes? Our free SEO scan reads a page and states what is there and what is missing, at no cost to you.
Where these figures come from
The subsidy rates and conditions summarised here were checked against the Netherlands Enterprise Agency (Rijksdienst voor Ondernemend Nederland, RVO), ISDE pages for owner-occupiers, businesses, heat pumps and ventilation, together with the 2026 changes page, on 29 September 2026. This is a dated source review, not a complete assessment of a project. Selected figures include the €1,025 starting amount and the €225 per kilowatt, the removal of the starting amount and the energy label bonus for a second or further air-to-water heat pump, the exclusion of split air-to-water appliances with a refrigerant charge under 3 kilograms and a GWP above 750, the one-off €400 for an energy-efficient ventilation system combined with insulation, the removal of the Uf requirement for window frames, and the raised maximum insulation value for listed-building glazing.
RVO links the 2026 refrigerant exclusion to European emissions rules; that does not establish a blanket installation ban
For current certification scope, consult IPLO’s official guidance at https://iplo.nl/thema/lucht/ozon-en-f-gassen/certificering/ (checked 29 September 2026). It distinguishes specified personal work and company cases. The original legal reference is retained for follow-up: the Dutch Decree on fluorinated greenhouse gases and ozone-depleting substances (Besluit gefluoreerde broeikasgassen en ozonlaagafbrekende stoffen) could not be retrieved in this review, so this page does not claim to have verified its current article wording. Confirm the applicable work, gases, certificates and transition with the certifying body; this is not a legal-compliance certification.
For grid capacity, use the responsible operator’s current, project-relevant information rather than an assumed national or local status
No postcode count, capacity status or waiting time is asserted here. A dated map can inform further checks, but is not automatically an address-specific connection decision. Ask the responsible operator to clarify the relevant connection where needed, and identify exactly what the published information does and does not establish.
What we do not do: state amounts without a source, promise a payback period, or suggest that a subsidy is guaranteed to be awarded
The ISDE has a budget and an assessment, and both are beyond your influence and ours.
Frequently asked questions about the ISDE in 2026
How is the ISDE amount for a heat pump built up?
The standard 2026 first-air-to-water calculation is €1,025 plus €225 from the first kilowatt, excluding any eligible A+++ bonus. In 2025 the €1,250 base counted €225 from the second kW, so the lower fixed amount alone does not mean a lower total. These figures do not cover every type or transition: a documented 2024 purchase installed in 2025 or 2026 may use the 2024 amount. These amounts come from the Netherlands Enterprise Agency (RVO) and were checked on 29 September 2026; check them again before passing them on to a customer.
Where eligible, the A+++ bonus is €200. Under the 2026 owner-occupier rule, a second or subsequent air-to-water heat pump installed in 2026 receives €225 per kW without starting amount or bonus. Units installed in 2024 or 2025 and applied for in 2026 retain the old amounts. Other heat-pump types and business routes need their own check.
Which heat pumps fall outside the ISDE in 2026?
RVO’s 2026 rule excludes split air-to-water heat pumps with a refrigerant charge below 3 kilograms AND a GWP above 750. Keep both strict thresholds: 3 kilograms is not below 3, and 750 is not above 750. Confirm relevant project dates and conditions. Passing this single test is not proof of eligibility, and this article is not a ruling on whether an installation is legally permitted.
Do I also get subsidy for a second heat pump in the same home?
For a second or subsequent air-to-water heat pump installed in 2026 under the relevant owner-occupier rule, RVO specifies €225 per kW, without the starting amount or energy-label bonus, including when the first pump was subsidised earlier. A unit installed in 2024 or 2025 and applied for in 2026 uses the old amounts. Verify the applicant route, appliance and any transition before using the calculation; this does not guarantee funding.
When do you apply for the ISDE, and can I do that as an installer?
Owner-occupiers normally apply after installation and payment; a heat-pump application is due within 24 months of installation. Business users must apply before accepting a quotation, reserving the appliance or commissioning installation; RVO advises waiting for its decision. Use the correct route and documents. An installer may act as an appropriately authorised intermediary, but that is a separately agreed service and does not require sharing the applicant’s login secrets.
Has anything been added to the ISDE in 2026?
For qualifying owner-occupier projects, eligible new ventilation installed from 1 January 2026 can receive a one-off €400 when combined with eligible insulation; apply within 24 months of both installations and check unit, property and regional conditions. Ventilation alone does not double the insulation amount. Qualifying monument glazing can have a maximum value of 5.8 W/m2K; frame panels remain 3.0. The frame Uf requirement was removed, not the glass conditions. A grid-operator confirmation of planned gas-meter removal can suffice for the relevant heat-network or business air-to-water route. These are selected changes, not all requirements.
Should I, as an installation company, write about subsidy on my site?
It can be useful to answer real subsidy questions if they are relevant to your customers. You need not offer an application service. Explain applicant routes, conditional calculations, exclusions and missing evidence with official sources and actual check dates. Review around annual changes and relevant announcements; one January reminder is not a guarantee of continuing accuracy or traffic.
Remember the boundary: explain the conditions, do not sell an award guarantee
The six selected changes, conditional calculation and refrigerant test can organise a useful explanation. Their value depends on accuracy, relevant customer questions and current checks, not a guarantee of year-round traffic or certainty. RVO decides applications. Preserve the distinction between excluded, potentially eligible and not yet determined when discussing a real project.
Record the reporting code where available, the relevant refrigerant facts, applicant route and source-check date. For an unlisted unit, verify RVO’s technical-documentation route; never present an estimate as an award. Want the advertising side too? Take a look at the hub for heat pump and air conditioning installers NL. Want to know how demand shifts through the year? Read the annual calendar NL. And if you get stuck, booking a call NL is the shortest route.